Wednesday, October 21, 2009

Wind in Cuba

Havana – DTC - Cuba's economic authorities have taken actions to make better use of renewable energy to boost the island's development and save resources. As part of those initiatives, the company Industria Mecánica Caribe (IMECA) has built 280 windmills to be used in agriculture and cattle raising farms. The windmills, which supply water to farms, have become a major economic alternative. In addition, experts are designing a new windmill that works better when the wind is mild. IMECA's production is expected to increase in 2010, considering that several companies are interested in acquiring the windmills.

As you can see Cuba understands how even little efforts can go along way.

Wednesday, September 23, 2009

Acciona Energy North America Dedicates EcoGrove Wind Farm In Illinois

What can we do in Wisconsin to get wind moving forward?

Lena, Ill.-based Acciona Energy North America dedicated its first wind farm in Illinois with a ceremony and luncheon. The company also presented superintendents from Lena-Winslow and Warren school districts each with a $5,000 annual scholarship fund for deserving high school seniors planning to pursue a secondary education leading to a career contributing to sustainability.

The 100.5 MW EcoGrove Wind Farm, located in Stephenson County, Ill., uses 67 Acciona Windpower 1.5 MW wind turbines and is spread across approximately 7,000 rural acres. With the exception of the small footprint made by the 67 turbines, at less than one acre each, land use is dominated by farming, which coexists with the wind energy production, according to the company.

Stephenson County made an investment in the EcoGrove project earlier this year, when 14 taxing districts unanimously approved a tax abatement for the project. This tax abatement, a sales/use tax exemption and other incentives were part of the state of Illinois Enterprise Zone Act for which the EcoGrove project met the criteria.

The wind turbines used at EcoGrove were produced at Acciona's West Branch, Iowa, manufacturing facility. The project itself was constructed by 125 local trades people and numerous local and regional suppliers and service providers. Nine of the 10 service technicians filling the project's newly created jobs are from the local area and include volunteer firefighters, retired military personnel, welders, machinists and a racecar driver.

Construction of the wind farm, including turbine erection, was managed by The Morse Group. The project was acquired by Acciona from EcoEnergy LLC, which continued to serve the project in a development and consultative capacity through the completion of the project.

SOURCE: Acciona Energy

Wednesday, February 4, 2009

Oil Companies get it

Independence, Kan.-based Allenergy Inc., an oil and natural gas development and production company, is expanding its business to include wind power.

Because of revenue and federal tax breaks, many landowners in the region are seeking to use their land for wind power generation, according to the company. Allenergy is taking the necessary steps to sell, service and install wind power generation. It can also benefit from wind power revenues on its current leases and on additional land leases.

"Though our core focus remains oil and natural gas production and well services, it has been a part of our long-term strategic plan to diversify," says CEO Larry Sanford. "With the incredible rise and fall of oil prices recently, it seems even more prudent to open up additional revenue streams."

Rex Horning, Allenergy's vice president of operations, has been leading the strategic planning for the company's diversification.

SOURCE: Allenergy Inc.

Friday, January 30, 2009

Green-e Marketplace program in 2008.

San Francisco-based Center for Resource Solutions (CRS) says there were a record number of voluntary purchases of Green-e Energy certified renewable energy by businesses in the Green-e Marketplace program in 2008. These purchases were led by Intel Corp., PepsiCo and Mohawk Paper. Intel made the largest purchase of renewable energy, with a 1.3 MWh purchase in January 2008.

The growth in the overall voluntary market for renewable energy has been driven by large commercial purchases of renewable energy certificates (RECs). Green power sales increased over 50% in 2007 over the previous year, with REC sales up 55%, according to the Department of Energy's National Renewable Energy Laboratory.

The third-party nonprofit certification program Green-e Energy certified 69% of the overall voluntary renewable energy market in 2007, and companies that buy a qualifying amount of certified renewable energy are eligible to join Green-e Marketplace and display the logo. These organizations voluntarily support energy generated from renewable sources, which displace other non-renewable sources from the electric grid. Total purchases by Green-e Marketplace participants exceeded 2.8 million MWh in 2008.

SOURCE: Center for Resource Solutions

Monday, January 19, 2009

Massachusetts wind power

Gov. Deval Patrick, D-Mass., has set a goal of developing 2,000 MW of wind power capacity by 2020. Citing new mandates that require greater use of renewable energy and sharp reductions in greenhouse gas emissions, Massachusetts can only fulfill these obligations with a significant commitment to wind power, according to the governor.

"With the growing interest in wind turbines we see in communities across the commonwealth and the abundant wind resource we have off our coast, wind power is going to be a centerpiece of the clean energy economy we are creating for Massachusetts," says Patrick.

Massachusetts has been selected by the U.S. Department of Energy to house one of two wind technology testing centers in the U.S.

Patrick has directed Energy and Environmental Affairs Secretary Ian Bowles to use the 2,000 MW wind goal, as well as the mandates and incentives provided in the package of clean energy legislation enacted last year, to guide the state's efforts to dramatically increase the development and deployment of wind power in the coming years.

There are currently nine wind turbines with capacity of 100 kW or greater installed in Massachusetts, for a total generating capacity of 6.6 MW. There are also more than 300 wind turbines at various stages of planning and permitting that represent a generating capacity of 800 MW.

Installing wind capacity of 2,000 MW would meet an estimated 10% of the state's current electric load with wind power.

SOURCE: Office of Gov. Deval Patrick

Monday, December 15, 2008

Scholarships!

FYI.

In August, the Utility Wind Integration Group (UWIG) Board of Directors voted to support the education of students enrolled in accredited college or vocational schools in programs related to power engineering, wind energy, or the maintenance of wind turbines. To this end, UWIG announced a scholarship program. To be eligible for scholarship assistance, a student must be currently enrolled at an accredited trade school or college in the United States or Canada in a field of study that could lead to a career related to utility power engineering or operation and maintenance of utility-scale wind equipment. These scholarships and stipends are intended to encourage completion of a college education or vocational degrees and programs, as well as to further the education of students, UWIG said.

UWIG may award up to three scholarships each year. Up to two $2,000 scholarships will be granted to students enrolled in an accredited engineering school who are pursuing a career in power engineering with a focus or major on wind generation, and up to one $1,000 scholarship to a student enrolled in an accredited wind technician program. The scholarships cover a single academic year and are not renewable. The $2,000 scholarships for the 2009-2010 academic term will be targeted toward students enrolled in undergraduate programs.

Application instructions and the application form can be found on the UWIG Web site at http://www.uwig.org/scholarshipprogram.html

The application deadline is February 16.

Sunday, December 7, 2008

Vestas Expands

Danish wind turbine supplier Vestas is seeking to consolidate its presence in Portland, Ore., by building a new headquarters for Vestas Americas, the company's business unit responsible for wind turbine sales, installation, and service and maintenance in North America.

Vestas Americas has been headquartered in Portland since 2002. In addition to the headquarters, Portland is home to one of Vestas' regional IT centers, a tools warehouse and the Vestas Business Academy training facility.

The proposed new headquarters, which is expected to be over 500,000 square feet in size and LEED Platinum certified, will consolidate Vestas' presence in Portland, as well as allow for future growth.

As negotiations are in process, Vestas cannot, at this point, confirm the sites it is considering for development. The company is currently working with the state of Oregon and city of Portland to leverage development, tax and financing options.

"The decision by Vestas to recommend building their new North American headquarters here sends a strong message that even in these difficult economic times, Portland has the confidence of companies willing to bring family wage jobs to the city," says Portland Mayor Tom Potter. "It also provides further validation of Portland's international reputation as a leading green city."

As the American wind industry continues to grow, Vestas Americas' desire to expand its headquarters in Portland also means further opportunities to form partnerships with Oregon's community colleges and universities to increase collaboration on wind energy programs and build a talented workforce for the company.

In addition, Vestas has just opened a new research and development hub in Boston. In 2009, the company will open a research center in Houston.

SOURCE: Vestas

Friday, November 14, 2008

A battery for Wind Power

Xcel looks to harness wind energy for use even when there's no wind

The project, which also includes the state and a tech firm, is installing a battery that is the first U.S. device that can store wind power.

By DEE DePASS, Star Tribune

Last update: November 12, 2008 - 10:20 PM

Next spring Xcel Energy Inc., the state of Minnesota and a Virginia-based technology firm will test the first battery in the country capable of storing wind energy.

The breakthrough technology, which is the size of two semitrailer trucks stacked atop each other, was built in Japan and shipped to Luverne, Minn., where it will store electricity generated by the nearby Minwind Energy wind turbines. S&C Electric Co. expects the equipment will be completely installed by April.

The battery consists of a score of 50-kilowatt modules. When it is fully charged, the massive sodium-sulfur battery -- which weighs about 80 tons -- can store 7.2 megawatt-hours of electricity. That's enough to power 500 homes for about seven hours. It will cost more than $5.4 million to buy and install the battery and analyze its performance.

The technology could help allay critics of wind energy, who lament that no electricity is produced when there's no wind. If successful, the battery will store wind energy and release its power onto the electrical grid when the air is still.

"Energy storage is key to expanding the use of renewable energy," Xcel Chairman and CEO Dick Kelly said. "This technology has the potential to reduce the impact caused by the variability and limited predictability of wind-energy generation."

Xcel, which invested $3.6 million in the project, expects the battery "to become very important to both us and our customers," Kelly said.

Xcel, the largest wind-energy producer in the country, is working to make it easier to integrate renewable energy onto the electrical grid as part of its "Smart Grid" strategy. It has a mandate to generate 30 percent of all its energy from renewable sources by 2020.

Xcel bought the battery from Japan's NGK Insulators Ltd. The batteries are used in Japan to store wind energy, and are used in a few nonwind applications in the United States.

"But this is the first U.S. application of the battery as a direct wind-energy storage device," Kelly said.

In addition to Xcel, the Minnesota Renewable Development Fund is contributing $1 million to the project. GridPoint, a power grid management firm based in Arlington, Va., kicked in $750,000. The University of Minnesota will analyze the battery system and grid connections. Other participants in the project include the National Renewable Energy Laboratory and the Great Plains Institute.

Xcel announced this month that it will develop 351 megawatts of new wind-energy production by December 2011 -- enough to power about 110,000 homes. The company said it plans to increase its current wind resources by more than 10 percent. The $900 million expansion includes a 201-megawatt project in southwest Minnesota's Nobles County, and a 150-megawatt project in Dickey and McIntosh Counties in so

Wednesday, October 1, 2008

Rhiode Island goes with off shore wind

R.I. Governor Names Developer For Offshore Wind Farm
in News Departments > New & Noteworthy
by NAW staff on Friday 26 September 2008
email the content item print the content item

Gov. Donald L. Carcieri, R-R.I., has announced that Deepwater Wind was chosen as the developer to construct a wind energy project off the shores of Rhode Island that will provide 1.3 million MWh per year of renewable energy annually - 15% of all electricity used in the state. It is expected that the project will cost in excess of $1 billion to construct, and the funds will come from private investment sources. A team of experts spent several months evaluating the detailed proposals submitted by seven development groups.

Deepwater Wind was established to develop utility-scale offshore wind projects in the northeastern part of the U.S. The company's major investors are FirstWind, a major developer of onshore wind projects in the U.S.; D.E. Shaw & Co., a capital investment firm with deep experience in the energy sector, and Ospraie Management, an asset management firm with a focus on alternative energy markets.

"This is much more than an energy project," says Carcieri. "This is about creating a new industry in Rhode Island - an industry that puts Rhode Island at the epicenter of the emerging alternative energy market. Deepwater Wind will help bring new economic activity, jobs and opportunity to Rhode Island. From construction through operation, Deepwater Wind projects will provide high-quality, green collar jobs. Further, Deepwater Wind's jacket foundations are the ideal cost-effective solution for the deeper waters in our region."

Deepwater Wind has pledged a significant private investment in Rhode Island of approximately $1.5 billion with the construction of a regional manufacturing facility in Quonset, and creating up to 800 direct jobs, with annual wages of $60 million. The Quonset facility will manufacture support structures upon which the turbine and its tower are based.

The exact location of the wind project will be determined from the results of the Special Area Management Plan (SAMP) permitting process led by the Rhode Island Coastal Resources Management Council in partnership with URI's Graduate School of Oceanography.

The state and Deepwater Wind will now enter a 90-day period to negotiate a formal development agreement. The final agreement will include the total commitment to Rhode Island made by Deepwater Wind, including the establishment of a manufacturing headquarters in the state and the reimbursement of the cost of the SAMP to the Renewable Energy Fund. In addition, the agreement will outline the preferred developer status for Deepwater Wind in the permitting process.

Final approval of the project is contingent on multiple regulatory approvals from both the state and federal governments.

SOURCE: Office of Gov. Donald L. Carcieri, Providence Plantations

Friday, September 19, 2008

Kettle Foods Gets it

Salem, Ore.-based Kettle Foods says that it has yielded environmental and economic benefits by adopting measures that include offsetting all of the electricity used to operate both its Salem and Beloit factories with wind power. Additionally, the Beloit plant is home to 18 rooftop wind turbines.

"When we decided to go for green - or in this case, gold - with LEED certification of our new factory, we knew it was the right thing to do," says Tim Fallon, president of Kettle Foods' North American division.

The company also recycles of 2,300 gallons of waste oil with conversion to biodiesel used to power a company fleet of diesel-engine cars called BioBeetles, and reduces more than three million pounds of carbon dioxide emissions annually resulting from the elimination of shipping lines between Oregon and the Midwest.

Saturday, September 13, 2008

Wind Heros

The Wind Coalition has announced the recipients of its first annual Wind Champions awards, recognizing policy-makers in Texas who have had an impact on growing the burgeoning wind energy industry in the state.

The coalition issued several awards, including a legacy award for policy-makers that demonstrated vision and were principally responsible for the state policy that allowed for the growth of the wind industry; a champion award for policy-makers who took a leadership role during the renewable energy debate and/or filed key legislation to expand the wind energy marketplace; and an outstanding supporter award to recognize the dozens of policy makers who not only voted favorable on wind energy issues, but who took an advocacy role in encouraging the industry's growth - such as supporting CREZ and issuing public comments in support of wind energy, and economic and environmental policies conducive to the growth of the industry.

Recipients of the award are:

Legacy supporters: Gov. Rick Perry, Land Commissioner Jerry Patterson, PUC Chairman Barry Smitherman, former PUC Commissioner Paul Hudson, Senator Troy Fraser, Senator Kim Brimer, Representative David Swinford, Representative Phil King, and Representative Mark Strama.

Champion supporters: Sens. Kip Averitt, Kel Seliger, Leticia Van de Putte, Judith Zaffirini, Kirk Watson and Rep. Warren Chisum.

Outstanding supporters: Sens. Robert Duncan, Craig Estes, Rodney Ellis, Kevin Eltife and Carlos Uresti. Representatives Alma Allen, Rafael Anchia, Doc Anderson, Dan Barrett, Leo Berman, Dwayne Bohac, Valinda Bolton, Dan Branch, Lon Burnam, Joaquin Castro, Wayne Christian, Ellen Cohen, Garnet Coleman, Drew Darby, Yvonne Davis, Joe Deshotel, Dawnna Dukes, Jim Dunnam, Harold Dutton, Kirk England, David Farabee, Dan Flynn, Stephen Frost, Pete Gallego, Juan Garcia, Ryan Guillen, Rick Hardcastle, Linda Harper-Brown, Joe Heflin, Ana Hernandez, Scott Hochberg, Donna Howard, Carl Isett, Delwin Jones, Ruth Jones McClendon, Susan King, David Leibowitz, Eddie Lucio, III, Jerry Madden, Trey Martinez-Fischer, Brian McCall, Jose Menendez, Elliott Naishtat, Rene Oliveira, Dora Olivo, Solomon Ortiz, Ken Paxton, Paula Pierson, Jim Pitts, Eddie Rodriguez, Patrick Rose, John Smithee, Joe Straus, Larry Taylor, Sylvester Turner, Corbin Van Arsdale, Allen Vaught, Marc Veasey, Mike Villarreal, Hubert Vo and Bill Zedler.

SOURCE: Wind Coalition

Wednesday, September 10, 2008

Pennsylvania moves forward!

The Wind Energy Supply Chain Initiative (WESCI), a new wind energy initiative, will create jobs, grow Pennsylvania's manufacturing base and produce environmentally friendly, home-grown energy, says Department of Community and Economic Development Secretary Dennis Yablonsky.

"Pennsylvania has a growing base of wind energy providers already here," Yablonsky says. "Companies like Gamesa in Cambria and Bucks counties; GE Wind in Erie; and Iberdrola, with operations in Somerset, Schuylkill and Luzerne counties, already have a significant presence in Pennsylvania, and they need hundreds of manufactured components to build, maintain and expand their operations. Wind and alternative energy providers need suppliers, and this initiative will help providers and suppliers find and connect with one another. WESCI will help attract wind energy providers and help more Pennsylvania manufacturers to transition and enter the growing alternative energy market."

As examples of wind industry supply needs, Yablonsky cited electrical equipment, power transmission devices, turbine generators, fabricated parts, gearboxes and bearings.

Key to the WESCI initiative will be the commonwealth's industrial resource center network - seven regional centers that provide comprehensive process improvement and strategic consulting services to Pennsylvania's small- and medium-sized manufacturers. Under the WESCI initiative, the centers will help identify supply chain gaps, gather provider requirements and find qualified suppliers.

SOURCE: Pennsylvania Department of Community & Economic Development

Friday, September 5, 2008

20,000 MW Baby!

The U.S. wind industry has raced past the 20,000 MW installed capacity milestone, achieving in two years what had previously taken more than two decades, the American Wind Energy Association (AWEA) reports.

Wind now provides 20,152 MW of electricity generating capacity in the U.S. But a delay in extending the production tax credit (PTC) could place 2009 projects on hold and discourage manufacturing investment, according to AWEA. The PTC is currently set to expire at the end of the year.

"Wind energy installations are well ahead of the curve for contributing 20% of the U.S. electric power supply by 2030 as envisioned by the U.S. Department of Energy," says Randall Swisher, executive director of AWEA. "However, the looming expiration of the federal renewable energy PTC less than four months from now threatens this spectacular progress. The PTC has been a critical factor in wind's very rapid growth as a part of the nation's power portfolio."

While Germany has more generating capacity installed - about 23,000 MW- the U.S. is producing more electricity from wind because of its much stronger winds. AWEA expects over 7,500 MW of new wind capacity to be added this year, expanding the U.S.'s wind energy fleet by 45% and bringing total capacity to 24,300 MW.

SOURCE: American Wind Energy Association

Tuesday, August 26, 2008

Bats Death near Wind Towers

The mystery of why large numbers of migratory bats are killed by certain turbines of southern Alberta’s wind farms every year may have been solved by a comprehensive University of Calgary research project that has yielded answers to the problem.

A bat mortality study supervised by U of C biology professor Robert Barclay that began in 2006 has determined that the vast majority of bats found dead below turbines near Pincher Creek suffered severe injuries to their respiratory systems consistent with a sudden drop in air pressure – called barotrauma – that occurs when the animals get close to turbine blades. The results will be published in the August 26 online edition of Current Biology. The study shows that 90 per cent the bats examined after death showed signs of internal hemorrhaging consistent with barotraumas while only about half of the bats showed any evidence of direct contact with the blades.

"Because bats can detect objects with echolocation, they seldom collide with man-made structures," said PhD candidate and project leader Erin Baerwald. "An atmospheric-pressure drop at wind-turbine blades is an undetectable—and potentially unforeseeable—hazard for bats, thus partially explaining the large number of bat fatalities at these specific structures,” Baerwald explains. "Given that bats are more susceptible to barotrauma than birds, and that bat fatalities at wind turbines far outnumber bird fatalities at most sites, wildlife fatalities at wind turbines are now a bat issue, not a bird issue."

The respiratory systems of bats and birds differ in important ways, in terms of both their structure and their function. Bats' lungs, like those of other mammals, are balloon-like, with two-way airflow ending in thin flexible sacs surrounded by capillaries, the researchers explained. When outside pressure drops, those sacs can over-expand, bursting the capillaries around them. Bird lungs, on the other hand, are more rigid and tube-like, with one-way circular airflow passing over and around capillaries. That rigid system can better withstand sudden drops in air pressure.

Nine species of bats are found in Alberta, three of which migrate through the province each year. The majority of bats killed at wind turbines are the migratory bats that roost in trees, including hoary bats, eastern red bats, and silver-haired bats. While little is known about their population sizes, the researchers said their deaths could have far-reaching consequences. Bats typically live for many years, in some cases reaching ages of 30 or more. Most also have just one or two pups at a time, and not necessarily every year.

"Slow reproductive rates can limit a population's ability to recover from crashes and thereby increase the risk of endangerment or extinction," said Barclay, noting that migrating animals tend to be more vulnerable in the first place.

All three species of migratory bats killed by wind turbines fly at night, eating thousands of insects—including many crop pests—per day as they go. Therefore, bat losses in one area could have very real effects on ecosystems miles away, along the bats' migration routes.

Baerwald said there is no obvious way to reduce the pressure drop at wind turbines without severely limiting their use. Because bats are more active when wind speeds are low, one strategy may be to increase the wind speed at which turbine blades begin to rotate during the bats' fall migration period.

The study was initiated by TransAlta after the company’s wind farm operators noticed bat carcasses below turbines and approached Barclay, an internationally-recognized bat expert, for advice.

“It was important for us to determine as much as we could about this issue,” said Jason Edworthy, Director, Stakeholder Relations for TransAlta. “Ultimately, it’s a situation we’re working hard to alleviate. Ongoing research with the University is seeing some real results in terms of mitigation of collisions.”

The paper “Barotrauma is a significant cause of bat fatalities at wind turbines” by Erin F. Baerwald, Genevieve H. D'Amours, Brandon J. Klug and Robert M.R. Barclay will be available online at: www.current-biology.com

Monday, August 25, 2008

American Energy Act

http://www.govtrack.us/data/us/bills.text/110/h/h6566.pdf

Above you will find the link to the Bill that the Democratic party fears so much.
All the GOP wants is an up or down vote. So why is Nancy so worried about this bill?

The Time is now!

Myself I am done waiting for the right person and the right time to move renewable energy forward!
As the GOP has done on the floor of the House Deeds not words are the call!
They are fighting for the American Energy we must join the effort.
The call is out join this fight!

Yes I have been lax in keeping up this blog but that has changed as of now! I will be writing about two very exciting projects that myself and a handful of crew will be moving on.
These two project are just a sample of what is to come

Wednesday, June 11, 2008

Report from Windpower 2008 (Vickerman)

Please read this very interesting report from Windpower 2008 @ Houston TX

Report from Windpower 2008 and the
Wind Powering America Summit
Houston, Texas

Michael Vickerman
RENEW/Wisconsin Wind Working Group
June 11, 2008


General impressions: AWEA's 2008 conference was an unceasing hive of
activity, especially on the trade show floor. RENEW was one of 15 Wisconsin
firms and organizations that participated in the Wisconsin Wind Works
exhibit space. Other participants were: Aarowcast (Shawano), Ambassador
Steel (Auburn, IN), Badger Transport (Clintonville), Bassett Mechanical
(Kaukauna), EcoEnergy (Madison), Lakeshore Technical College (Cleveland),
Lapham-Hickey Steel (Oshkosh), Lindquist Machine Corporation (Green Bay),
Merit Gear (Antigo), Natural Resources Consulting (Cottage Grove), Oscar
Boldt Construction (Appleton), Orion Construction Group (Appleton),
Trace-A-Matic (Brookfield), and Wausaukee Composites (Wausaukee). By pooling
our resources, we were able to secure a centrally located and highly visible
space on the trade show floor. Jerry Murphy and his team at The New North
did a fantastic job of organizing this pavilion and scheduling the staffing.
With all of our materials displayed under one sign we succeeded in
projecting a sense that Wisconsin companies are comfortable doing business
with each other. I hope we do it again next year in Minneapolis.

Plenty of Wisconsin companies had their own exhibit booths, including
Johnson Controls (Milwaukee), Michels Wind Energy (Brownsville), Tower Tech
at the Broadwind booth (Manitowoc), Manitowoc Crane (Manitowoc), Foley and
Lardner (Milwaukee), Michael Best and Friedrich (Madison), Shuttlelift
(Sturgeon Bay), Snap-on (Kenosha) and Trachte (Oregon). No doubt there were
other Wisconsin companies displaying at the exhibit hall.

I did not see any representatives from the State of Wisconsin at the
conference/trade show. The absence of an official state presence was
heightened by the profusion of other state pavilions--Iowa, Minnesota,
Michigan, Ohio, Oklahoma, Texas and Kansas--which were staffed by agency
employees and funded with public dollars. Nor did I see any representatives
of Wisconsin ports. I soon learned the reason why.

*********************************************************************

Transportation: My visit with Lone Star Transportation was eye-opening to
the say the least. Lone Star is Vestas' preferred heavy-hauler. The
exhibitors there described the difficulties they endured in dealing with the
restrictions state DOT placed on the transportation of oversized equipment
to We Energies' Blue Sky Green Field project. State DOT imposed a
prohibition on transporting oversize loads during the day, which made it
impossible to truck the blades, nacelles and tower sections directly to the
erection sites. We Energies had to expand the laydown area behind its
operations center in order to accommodate deliveries of the equipment. Some
792 pieces of equipment had to be offloaded in the yard and then reloaded on
separate vehicles and taken to the 88 turbine sites. Double-handling this
equipment is expensive. WE estimates that the restrictions on transportation
added nearly $4 million to the cost of constructing Blue Sky Green Field. No
doubt they resulted in costs to other companies. The same restrictions also
applied to the Forward project, which was going up at the same time.
According to Lone Star, Wisconsin is very much the outlier when it comes to
regulating transportation of oversize wind energy equipment.

In regards to the Cedar Ridge project now under construction, state DOT will
allow limited daytime transportation of oversize equipment. However, in
order to reduce the cost of transporting turbines, nacelles and blades
through Wisconsin, Vestas decided to ship that equipment down to the Port of
Beaumont in Texas, and transport it by rail to Green Bay. Much of it has
already arrived, sitting in a rail yard waiting to be transported down to
Fond du Lac County. These loads could have been shipped to either Milwaukee
or Marinette-Menominee. No wonder I didn't see any Wisconsin port
representatives at the conference!

Wisconsin also requires haulers to obtain an individual permit for each load
carried along a surveyed route. Contrast that requirement with Iowa's
practice of issuing a permit that covers all trips on that route for six
(could be 12) months. Iowa's DOT does not place limits on the time of day
when oversize wind equipment can be legally transported.

Between the extra costs incurred by heavy haulers and the lost port traffic,
Wisconsin's transportation policies have imposed a heavy economic cost on
in-state wind development in Wisconsin. The economic damage could spread to
other states if turbine manufacturers continue to avoid Wisconsin ports in
favor of less convenient locations that require more truck or rail travel
after the equipment is unloaded.

************************************

Project Outlook for 2008 and 2009: Babcock and Brown, which bought two
permitted projects in Wisconsin, will begin constructing the 36-turbine
Butler Ridge project this month. RES Americas is the general contractor. The
project, located in southeast Dodge County, should be on-line by the end of
December. I have no information about the transportation arrangements for
that installation, but I can't help but observe that the project site is
less than 60 miles from the Port of Milwaukee.

Babcock and Brown also intends to build its second permitted Wisconsin
project in 2009. The installation would go up in Manitowoc County not far
from Point Beach. B&B's permit lasts through the end of next year. If it
were to expire before the wind project is completed, B&B would have to
obtain an extension or seek a brand new permit under the county's revised
wind ordinance, which, as you know, was essentially written by the WINDCOWs.


***********************************

Wind Powering America Summit: This was a much more interactive and engaging
meeting than last year's gathering. I took part in a role-playing exercise
in which the most common knocks against windpower were voiced by one group
of people (myself included) and then rebutted by another group. As my
group's designated NIMBY, I channeled my inner Dave Korinek and spewed forth
one Internet myth after another about safety (exploding turbines and
collapsing towers), health impacts (stray voltage, "wind turbine syndrome"),
and quality of life complaints (shadow flicker, aesthetics). Judging from
their tinny and wonkish responses, the pro-wind people would benefit greatly
from increased exposure to real-life NIMBY's and attending Mick Sagrillo's
"How to Deal with Wind Opposition" workshop.

It's worth mentioning that the Ohio Legislature recently took steps to
reduce the likelihood of stalled wind projects due to permitting hassles.
The Legislature voted to lower the threshold for state review of wind
projects from 50 MW to 5 MW. If approved, Ohio's threshold would be even
lower than the one in Minnesota (25 MW). That change was incorporated in a
budget repair bill that is now sitting on the Governor's desk. The Governor
supports the provision, I'm told.

The most memorable line of the meeting came out of Randy Udall's talk. After
his meditation on the energy resource constraints that are converging
directly in front of us, he referenced the AWEA/DOE 20% by 2030 report by
saying: "we should be planting wind turbines like trees." Of all the fossil
fuel supply problems that are hard-wired into our future, the biggest shapes
up to be maintaining natural gas supply given current depletion rates. In
Randy's view (and mine), substituting wind for fossil generation is even
more valuable as an energy security strategy than as a carbon reduction
measure.






Michael Vickerman
RENEW Wisconsin
Wisconsin Wind Working Group



We MUST act now to move Windpower forward!

Wayne Clingman
Green Racine

Monday, May 26, 2008

Can Racine get on board this idea?

Wind turbines turn $2.3 million in profits for Duluth Seaway Port Authority
Peter Passi Duluth News Tribune
Published Friday, May 23, 2008

Fiscal year 2007 will go down as the most profitable ever for the Duluth
Seaway Port Authority. The authority closed its fiscal books March 31 this
year, more than $2.3 million in the black, according to Chief Financial
Officer John Kubow.

The port authority's previous financial best had been fiscal year 2001, when
it reported a net profit of $837,000.

So what made fiscal year 2007 so special?

Kubow's simple explanation: "Sales of wind turbine components."

The port authority gets a cut of all revenues generated by the Clure Marine
Terminal's operator, Lake Superior Warehousing Co. Inc. And the company
handled lots of wind power equipment last shipping season, both inbound from
overseas and outbound to destinations on the East Coast and Europe.

In 2007, the American Wind Energy Association estimated between $8 billion
and $10 billion was being invested in wind power annually, much of it in the
nation's heartland, including North Dakota, South Dakota, Minnesota and
Iowa.

Initially, the port was seeing large shipments of wind farm equipment
imported from Germany, Denmark and Spain.

As wind farms proliferate, domestic production of wind turbine and tower
equipment has been climbing, expanding the outbound component of the port's
business. Duluth also has become a conduit for North Dakota-built wind power
equipment bound for domestic and export markets.

This rapidly changing scene is fraught with opportunities and challenges,
according to Ron Johnson, the port authority's trade development director.

"It's more than a moving target," he said. "Right now, it's a blurred
target."

Jonathan Lamb, general manager of Lake Superior Warehousing, said the
current shipping season is off to a more modest start, but based on recent
inquiries and several large wind power projects in the works, including
Minnesota Power's plans to bring 500 to 700 megawatts of wind power online
in North Dakota in the next few years, he believes the port may be able to
equal the volume of equipment it handled last year.

To handle the massive wind turbines, blades, nacelles and towers the port
has been receiving, the laydown area around the terminal has been greatly
expanded. The port authority invested about $400,000 last year to ready more
than six acres of land for the equipment. Lake Superior Warehousing also
prepared an additional 25 acres of land at the Garfield C and D docks to use
as a laydown area.

Kubow said those types of investments wouldn't be made if the port authority
and Lake Superior Warehousing weren't confident about the future.

Part of that confidence is inspired by government mandates, such as
Minnesota's requirement that utilities in the state derive 25 percent of
their power from renewable resources by 2025.

"That's what I call government-impelled cargo," Kubow said.


PETER PASSI covers business and development. He can be reached weekdays at
(218) 279-5526 or by e-mail at ppassi@duluthnews.com.

Monday, May 19, 2008

Blue Sky on Line

From: Barry McNulty
May 19, 2008
We Energies wind project begins commercial operation
Largest wind farm to date in Wisconsin is on time and on budget
MILWAUKEE - We Energies’ Blue Sky Green Field wind project was placed into commercial service today. The 88 turbines have a demonstrated capacity of 145 megawatts and are expected to generate more than 328 million emission-free kilowatt hours annually - enough to power 36,000 homes.
“Blue Sky Green Field is one of several targeted efforts we’re undertaking to generate more energy from renewable resources,” said Rick Kuester, executive vice president of Wisconsin Energy Corporation, the parent of We Energies. “We appreciate the support we have received from our customers and from the communities of Calumet and Marshfield and northeast Fond du Lac County in making the project a reality.”
At a cost of approximately $300 million, the Blue Sky Green Field project consists of 88 Vestas Wind Systems turbines spread across 10,600 acres. Each turbine is capable of producing 1.65 megawatts of electricity. The V82 turbines have a hub height of approximately 262 feet and a blade length of 134 feet. From the foundation to the tip, each tower has a height 397 feet.
We Energies continues to pursue the development of additional renewable energy to meet customer demand and to meet the state of Wisconsin’s Renewable Portfolio Standard, which requires utilities across the state to generate 10 percent of their energy from renewable sources by 2015. “While the Blue Sky Green Field project is an important contributor to our renewable goals, We Energies will need to add several more renewable projects to meet the state mandate,” said Kuester.
Construction of Blue Sky Green Field began in June 2007. The project was built largely with the talents of Wisconsin companies and craft labor. Collectively, more than 400,000 labor hours were devoted to completing the project. Although the turbines are now in operation, We Energies will be working with the landowners in the area to ensure that proper restoration from construction activity is completed.
- more -
We Energies
Page 2
We Energies serves more than 1.1 million electric customers in Wisconsin and Michigan’s Upper Peninsula and more than 1 million natural gas customers in Wisconsin. Its electricity prices are approximately seven percent below the national average. We Energies is the trade name of Wisconsin Electric Power Company and Wisconsin Gas LLC, the principal utility subsidiaries of Wisconsin Energy Corporation (NYSE: WEC). Visit the We Energies Web site at www.we-energies.com. Learn more about Wisconsin Energy Corporation by visiting www.wisconsinenergy.com.
# # #

Saturday, May 17, 2008

Billions in Economic Growth via Wind Power Why not in Racine WI

FOR IMMEDIATE RELEASE:
April 29, 2008
Contact:
Christine Real de Azua (202) 383-2508

OVER 600 INDUSTRY LEADERS SEE POTENTIAL FOR NEW JOBS,
BILLIONS IN ECONOMIC GROWTH IN WIND POWER SUPPLY CHAIN

AWEA Holds Supply Chain Workshop in Des Moines, April 29-30

Representatives from a diverse range of industries, including foundries, tooling companies, gearbox manufacturers, railroads and other transportation providers, electronics manufacturers and metal fabricators, as well as state economic development officers, will gather at the American Wind Energy Association’s (AWEA) Wind Power Supply Chain Workshop in Des Moines, Iowa, April 29-30.

Drawing attention to Iowa as a growing hub for wind power-related job creation, the Iowa Department of Economic Development is co-sponsoring the workshop.

“I'm honored to welcome AWEA to our state,” said Iowa Governor Chet Culver (D). “It is our responsibility to tap clean, renewable energy resources to spur investment and create new, green-collar jobs in Iowa. Communities across Iowa that have experienced real economic challenges, like Keokuk, Fort Madison and Newton, have recently seen a new rebirth by tapping into our booming wind industry. While each of these cities is in the process of adding hundreds of new wind-generation manufacturing jobs, this is only the beginning of what is possible.”

“Wind energy has not only helped power many parts of Iowa, but it has provided millions of dollars in economic activity to struggling communities,” added Senator Chuck Grassley (R-IA). “Wind is an affordable and inexhaustible source of domestically produced energy. We must do everything possible to capture and grow this renewable source of energy all the way up the supply chain."

AWEA expects about 600 attendees, making the workshop the trade group’s largest ever as well as the first aimed at expanding the industry’s “supply chain,” or range of component suppliers.

“The U.S. wind power industry is a bright spot in our economy,” said AWEA Executive Director Randall Swisher. “Every megawatt of installed wind power creates employment in manufacturing, construction and operations as well as jobs in advertising, office support, environmental assessment and other related professions. America’s vast wind resources have barely been tapped, and we have only just begun to see wind’s potential to generate broad economic growth.”

Encouraged by the stability of the federal production tax credit (PTC), U.S. wind industry manufacturing has surged from a very small base in 2005 to more than 100 facilities in 2007.

In 2005, the average wind turbine contained less than 30% American-made components. Today, domestically manufactured content is approaching 50%. (A wind turbine is composed of some 8,000 components, ranging from towers and blades to gearboxes, generators, castings, ball bearings, and electronic components.) New facilities were opened or announced last year in Arkansas, Colorado, Illinois, Iowa, North Carolina, New York, Oklahoma, South Dakota, Texas and Wisconsin. These facilities are expected to create more than 6,000 permanent, well-paying jobs. Many of the fastest-growing wind industry suppliers in the U.S. are slated to attend the workshop this week.

“While the wind industry’s strong growth is encouraging, the PTC is in danger of lapsing at the end of this year,” said Swisher. “It is vitally important for Congress and the President to quickly extend the PTC—the primary U.S. incentive for wind power—as part of a long-term policy for renewable energy to foster investment in wind installations, manufacturing capacity and thousands of new jobs.”

At the workshop, industry leaders will discuss the need to ramp up U.S.-based manufacturing and state incentives that encourage such investments as well as projections for growth—which will be determined largely by whether the U.S. government puts in place a strong, supportive, stable policy for renewable energy, starting with a quick extension of the PTC.

For more information, contact Christine Real de Azua, crealdeazua@awea.org.